Monday, September 21, 2009

Work Continues on Cabin


Work continues on the log walls to finish window cuts and install floor joists for the loft. We are also trying to decide on design details for the inside and outside stone walls.

Well Pump Installed


The pump for the well is now installed. But will no electricity hookup yet we need the generator to power the pump. I can't wait to taste our well water, but that will have to wait until out next trip out there, I guess.

Friday, September 4, 2009

Log Stacking Complete !!!


The log wall assembly on site has been completed !!!

Septic is being installed this week. Roof framing and drilling for ground source heat pump installation should happen this month as well.