Monday, September 21, 2009
Work Continues on Cabin
Work continues on the log walls to finish window cuts and install floor joists for the loft. We are also trying to decide on design details for the inside and outside stone walls.
Well Pump Installed
Friday, September 4, 2009
Log Stacking Complete !!!
Subscribe to:
Posts (Atom)