Thursday, December 15, 2011
Mantle
Our awesome craftsmen-builders have decided to put in a mantle for us as a Christmas present! This is a photo of it before it is permanently installed. The log is a engleman spruce . . . the same kind of log used for the walls of the cabin itself.
Interior Trim Complete
Tuesday, August 9, 2011
Fridge!
Cabin Interior
Most everything is done at the cabin. We do still have punch-list items to complete (baseboards and some trim), and we have installed temporary wooden countertops since we are having so much trouble finding good stone. But the electricity and water are are on and it is basically ready to stay there. Work for the summer is wrapping up and the cleaners are coming to scrub everything tomorrow.
Tuesday, July 19, 2011
Bath Tub Through the Window?
Wednesday, July 13, 2011
Side Entry
Great Room at Night
Monday, July 11, 2011
Cabinets Installed
The kitchen and bathroom cabinets (made from Juniper) have been installed and look GREAT. Now we are just waiting on countertops and bathroom tile, which have been giving us difficulty . . . not easy to find good stone quarried in the U.S. these days! Looks like we have the tile figured out and it should be installed starting this week. And we have a line on stone countertops, but the schedule is a little murkier on that.
Tuesday, June 28, 2011
Railing Detail
Sunday, June 19, 2011
Mattress Shopping
Thursday, June 16, 2011
Loft Railing Construction
Thursday, June 9, 2011
Upper Loft Stairs Installed
Utility Room
Friday, March 4, 2011
Cabin in Snow
Tuesday, February 1, 2011
Hallway Floor
Tuesday, January 18, 2011
Great Room Floor Installation
Sunday, January 16, 2011
Thursday, January 13, 2011
Larch Floor Installation
Subscribe to: