Wednesday, June 9, 2010

Frame Wall Insulation


The frame wall insulation is in. The frame walls are now ready for wood paneling. This is a picture in the loft of a dormer wall with insulation (white).

Tuesday, May 25, 2010

Shingles and Flashing


Copper flashing and shingles are finishing off the roof work this week.

Friday, May 14, 2010

Electrical


Interior framing and electrical wiring is being finished up this week at the cabin. We are also in the process of working out the details of the kitchen and bathroom cabinet and fixture designs.

Saturday, May 8, 2010

Plumbing


Rough-in plumbing has been completed for the cabin including the laundry room, bathroom and kitchen. This is a photo of the sink/toilet side of the bathroom.

Saturday, April 17, 2010

Front Door


Here is the new cabin front door (and the people who made it). We changed our minds on the design after the first front door was completed (oops). . . but we like this one a lot. It should be installed in the next couple of weeks.

Sunday, April 11, 2010

April Visit


It's been about a year since ground was broken on the cabin . . . we stopped by before a business conference to check out the progress. See me in the window?

Wednesday, April 7, 2010

Standoffs


The roof is fully sealed and standoffs for the solar panels have been installed on the south-facing side. Shingles will come next after the stone chimney is completed.