The loft floorboards are being installed this week. They are about 2 inches thick pine and look great from above and below, where they will be visible between the ceiling beams.
That's Brian installing the boards and Bell checking his work.
The exterior chimney stonework in complete, and the wood siding is started and should be complete this week as well. This photo shows the east elevation of the cabin.
The frame wall insulation is in. The frame walls are now ready for wood paneling. This is a picture in the loft of a dormer wall with insulation (white).
Interior framing and electrical wiring is being finished up this week at the cabin. We are also in the process of working out the details of the kitchen and bathroom cabinet and fixture designs.
Rough-in plumbing has been completed for the cabin including the laundry room, bathroom and kitchen. This is a photo of the sink/toilet side of the bathroom.
Here is the new cabin front door (and the people who made it). We changed our minds on the design after the first front door was completed (oops). . . but we like this one a lot. It should be installed in the next couple of weeks.