Thursday, June 9, 2011

Utility Room


The utility room is complete with painted walls, rubberized floor, trap door to the crawl space, and solar inverter.

Friday, March 4, 2011

Cabin in Snow


A nice shot of the cabin in snow this winter, taken by one of the guys working on the interior. Stairs to the loft and loft railing are going in now, and kitchen and bath cabinets have been ordered.

Tuesday, February 1, 2011

Hallway Floor


Here is a look down the hallway from the guest room towards the great room. Ran out of boards with 80sqft left, but more is on the way and the entire cabin floor should be done soon.

Tuesday, January 18, 2011

Great Room Floor Installation


Here is a good shot showing the installation of the floor boards in the Great Room near the side door. Note the complication introduced by the solid wood post and also notice the underlying plywood and radiant heat tubes that they have to be careful not to puncture when nailing down the boards!

Sunday, January 16, 2011

Cabin in Snow


A nice shot of the cabin taken by Ella with her iPhone from the slopes of MooseView mountain.

Colorado Driveway


Our view onto the land when we arrived New Year's Day.

Thursday, January 13, 2011

Larch Floor Installation


Wall paneling is pretty much done, and installation of the floorboards started this week. Larch wood floorboards of varying width are being installed over the radiant floor heat tubes and plywood matrix.

This is a photo of the guest bedroom floor, which was the first to be finished.