A nice shot of the cabin in snow this winter, taken by one of the guys working on the interior. Stairs to the loft and loft railing are going in now, and kitchen and bath cabinets have been ordered.
Here is a look down the hallway from the guest room towards the great room. Ran out of boards with 80sqft left, but more is on the way and the entire cabin floor should be done soon.
Here is a good shot showing the installation of the floor boards in the Great Room near the side door. Note the complication introduced by the solid wood post and also notice the underlying plywood and radiant heat tubes that they have to be careful not to puncture when nailing down the boards!