The radiant floor plumbing was installed last week throughout the main floor of the cabin. This is a shot looking down at part of the great room floor. Soon it will be covered over with reclaimed heart pine floor boards.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment